সৌদি আরবের তেল কারখানা বাংলাদেশে
সৌদি আরবের তেল কারখানা বাংলাদেশে
<
>সমুদ্রের অভিভাবক হয়ে উঠছে? বাংলাদেশ
Moreover, Larger mother vessels will now be able to load or unload their goods directly from the jetty of Payra port as capital dredging of Ramnabad channel is now complete, according to port officials.
Eventually, Ships with a draft of up to 10.5 metres, ranging 225 metres long and 30 metres wide, can now dock at the jetty instead of having to load or unload their goods through lighter vessels further out, said Rear Admiral Mohammad Sohail, chairman of Payra Port Authority.
Furthermore, Belgium's Jan De Nul, a maritime infrastructure construction and maintenance company based in Luxembourg, yesterday handed over the channel to the port authorities after completing the dredging works.
Consequently, the project, which cost Tk 6,500 crore, was initiated in January 2021 in a bid to turn Payra port into a major shipping hub for the country by facilitating the access of larger vessels.
On the other hand, Ramnabad channel now has the highest depth, while Chattogram port, the biggest seaport in Bangladesh, has only just recorded the berthing of a vessel with a 10 metres draft in January this year.
[ The Daily Star on 22 April 2025]
1 comment
Oil refinery hub create in Bangladesh seaport it will be economical positive vibes.
Post a Comment